SEMESTER I |
|||||||
No |
Kode MK |
Mata Kuliah |
In English |
SKS |
Prasyarat |
Total SKS |
|
Kode MK |
Mata Kuliah |
||||||
1.1. |
UNI 001118 |
Indonesian Language |
2 |
- |
- |
|
|
1.2. |
UNI 002118 |
Pancasila |
2 |
- |
- |
||
1.3. |
TKS 103118 |
Calculus |
3 |
- |
- |
||
1.4. |
TKS 104118 |
Physics for Civil Engineering |
3 |
- |
- |
||
1.5. |
TKS 105118 |
Statistic & Probability |
2 |
- |
- |
||
1.6. |
TKS 106118 |
Material Chemistry for Civil Engineering |
2 |
- |
- |
||
1.7. |
TKS 107118 |
Environmental Science |
2 |
- |
- |
||
1.8. |
TKS 108118 |
Engineering Drawing |
3 |
- |
- |
||
|
|
Jumlah SKS Semester 1 |
|
19 |
|
Jumlah SKS Kumulatif |
19 |
SEMESTER II |
|||||||
No |
Kode MK |
Mata Kuliah |
In English |
SKS |
Prasyarat |
Total SKS |
|
Kode MK |
Mata Kuliah |
||||||
2.1. |
UNI 003118 |
Religion |
2 |
- |
- |
|
|
2.2. |
UNI 004118 |
Civics Education |
2 |
- |
- |
||
2.3. |
TKS 203118 |
Mathematics for Civil Engineering |
3 |
- |
- |
||
2.4. |
TKS 204118 |
Statics |
3 |
- |
- |
||
2.5. |
TKS 205118 |
Material Science |
3 |
- |
- |
||
2.6. |
TKS 206118 |
Traffic Engineering |
3 |
- |
- |
||
2.7. |
TKS 207118 |
Surveying and Mapping |
3 |
- |
- |
||
|
|
Jumlah SKS Semester 2 |
|
19 |
|
Jumlah SKS Kumulatif |
38 |
SEMESTER III |
|||||||
No |
Kode MK |
Mata Kuliah |
In English |
SKS |
Prasyarat |
Total SKS |
|
Kode MK |
Mata Kuliah |
||||||
3.1. |
TKS 301218 |
Numerical Analysis |
3 |
TKS 203118 |
Matematika Teknik Sipil |
|
|
3.2. |
TKS 302218 |
Mechanics of Material |
3 |
TKS 204118 |
Statika |
||
3.3. |
TKS 303218 |
Soil Mechanics |
3 |
- |
- |
||
3.4. |
TKS 304218 |
Design of Road Geometric |
3 |
TKS 206118 |
Rekayasa Lalu Lintas |
||
3.5. |
TKS 305218 |
Fluid Mechanics & Hydraulic |
3 |
- |
- |
||
3.6. |
TKS 306218 |
Engineering Hydrology |
3 |
- |
- |
||
3.7. |
TKS 307218 |
Transportation Planning |
3 |
TKS 206118 |
Rekayasa Lalu Lintas |
||
|
|
Jumlah SKS Semester 3 |
|
21 |
|
Jumlah SKS Kumulatif |
59 |
SEMESTER IV |
|||||||
No |
Kode MK |
Mata Kuliah |
In English |
SKS |
Prasyarat |
Total SKS |
|
Kode MK |
Mata Kuliah |
||||||
4.1. |
TKS 401218 |
Computer Programming |
3 |
TKS 301218 |
Analisis Numerik |
|
|
4.2. |
TKS 402218 |
Steel Construction Design & Analysis |
3 |
TKS 204118, TKS 302218 |
Statika, Mekanika Bahan |
||
4.3. |
TKS 403218 |
Concrete Element Structure Design & Analysis |
3 |
TKS 204118, TKS 302218 |
Statika, Mekanika Bahan |
||
4.4. |
TKS 404218 |
Structural Analysis |
3 |
TKS 204118, TKS 302218 |
Statika, Mekanika Bahan |
||
4.5. |
TKS 405218 |
Geotechnical Structure |
3 |
TKS 303218 |
Mekanika Tanah |
||
4.6. |
TKS 406218 |
Irrigation & Drainage Design |
3 |
TKS 305218, TKS 306218 |
Mekanika Fluida dan Hidraulika, Hidrologi Teknik |
||
4.7. |
TKS 407218 |
Project Management |
3 |
- |
- |
||
|
|
Jumlah SKS Semester 4 |
|
21 |
|
Jumlah SKS Kumulatif |
80 |
SEMESTER V |
|||||||
No |
Kode MK |
Mata Kuliah |
In English |
SKS |
Prasyarat |
Total SKS |
|
Kode MK |
Mata Kuliah |
||||||
5.1. |
TKS 501318 |
Matrix Structure Analysis |
3 |
TKS 404218 |
Analisis Struktur |
|
|
5.2. |
TKS 502318 |
Concrete Construction Design and Analysis |
3 |
TKS 403218 |
Perencanaan dan Analisis Elemen Struktur Beton |
||
5.3. |
TKS 503318 |
Steel Bridge Design and Analysis |
3 |
TKS 402218 |
Perencanaan dan Analisis Konstruksi Baja |
||
5.4. |
TKS 504318 |
River & Swamp Engineering |
3 |
TKS 305218 |
Mekanika Fluida dan Hidraulika |
||
5.5. |
TKS 505318 |
Foundation Design |
3 |
TKS 303218, TKS 405218 |
Mekanika Tanah, Struktur Geoteknik |
||
5.6. |
TKS 506318 |
Construction Implementation Method |
3 |
TKS 407218 |
Manajemen Proyek |
||
5.7. |
TKS 507318 |
Geographic Information Systems (GIS) for Civil Engineering |
3 |
TKS 207118 |
Survei dan Pemetaan |
||
|
|
Jumlah SKS Semester 5 |
|
21 |
|
Jumlah SKS Kumulatif |
101 |
SEMESTER VI |
|||||||
No |
Kode MK |
Mata Kuliah |
In English |
SKS |
Prasyarat |
Total SKS |
|
Kode MK |
Mata Kuliah |
||||||
6.1. |
TKS 601318 |
Civil Works Design |
3 |
- |
Diatur Tersendiri |
||
6.2. |
TKS 602318 |
Bahan Perkerasan Jalan* |
Highway Pavements |
3 |
TKS 304218 |
Perancangan Geometrik Jalan |
|
6.3. |
TKS 603318 |
Writing Technic & Presentation |
3 |
- |
- |
||
6.4. |
TKS 2XXXXX |
Mata Kuliah Pilihan 1 |
Elective Course 1 |
3 |
- |
- |
|
6.5. |
TKS 2XXXXX |
Mata Kuliah Pilihan 2 |
Elective Course 2 |
3 |
- |
- |
|
6.6. |
TKS 2XXXXX |
Mata Kuliah Pilihan 3 |
Elective Course 3 |
3 |
- |
- |
|
|
|
Jumlah SKS Semester 6 |
18 |
|
Jumlah SKS Kumulatif |
119 |
SEMESTER VII |
|||||||
No |
Kode MK |
Mata Kuliah |
In English |
SKS |
Prasyarat |
Total SKS |
|
Kode MK |
Mata Kuliah |
||||||
7.1. |
TKS 701418 |
Structural Dynamic & Earthquake Engineering |
3 |
TKS 501318 |
Analisis Struktur Metode Matriks |
|
|
7.2. |
TKS 702418 |
Engineering Economic |
3 |
TKS 407218 |
Manajemen Proyek |
|
|
7.3. |
TKS 703418 |
Ethics and Legal Aspects of Construction |
3 |
- |
- |
||
7.4. |
TKS 1XXXXX |
Matakuliah Pilihan 4 |
Elective Course 4 |
3 |
- |
- |
|
7.5. |
TKS 1XXXXX |
Matakuliah Pilihan 5 |
Elective Course 5 |
3 |
- |
- |
|
|
|
Jumlah SKS Semester 7 |
15 |
|
Jumlah SKS Kumulatif |
134 |
SEMESTER VIII |
|||||||
No |
Kode MK |
Mata Kuliah |
In English |
SKS |
Prasyarat |
Total SKS |
|
Kode MK |
Mata Kuliah |
||||||
8.1. |
TKS 801418 |
Enterpreneurship in Civil Engineering |
3 |
- |
- |
|
|
|
|
Jumlah SKS |
3 |
|
Jumlah SKS Kumulatif |
137 |
KERJA PRAKTIK DAN TUGAS AKHIR |
|||||||
No |
Kode MK |
Mata Kuliah |
In English |
SKS |
Prasyarat |
Total SKS |
|
Kode MK |
Mata Kuliah |
||||||
1. |
TKS 401418 |
Internship Program (Project Service) |
3 |
- |
Diatur Tersendiri |
|
|
2. |
TKS 402418 |
Final Year Project / Independent work |
4 |
- |
Diatur Tersendiri |
||
|
|
Jumlah SKS |
7 |
|
Jumlah SKS Kumulatif |
144 |
MATA KULIAH PILIHAN SEMESTER GANJIL |
|||||
No |
Kode MK |
Mata Kuliah |
In English |
SKS |
Prasyarat |
1 |
TKS 101318 |
Pre-stressed Concrete Structure |
3 |
- |
|
2 |
TKS 102318 |
Teknologi Beton Mutakhir |
Advance Concrete Technology |
3 |
- |
3 |
TKS 103318 |
Wood Structure |
3 |
- |
|
4 |
TKS 104318 |
Metode Elemen Hingga |
Finite Element Method |
3 |
- |
5 |
TKS 105318 |
Soil Improvement Engineering |
3 |
- |
|
6 |
TKS 106318 |
Numerical Analysis in Geotechnic |
3 |
- |
|
7 |
TKS 107318 |
Hydraulic Modelling |
3 |
- |
|
8 |
TKS 108318 |
Erosi dan Sedimentasi |
Erotion & Sedimentation |
3 |
- |
9 |
TKS 109318 |
Coastal Engineering |
3 |
- |
|
10 |
TKS 110318 |
Mass Public Transportation Planning |
3 |
- |
|
11 |
TKS 111318 |
Airport Planning |
3 |
- |
|
12 |
TKS 112318 |
Harbour Planning |
3 |
- |
|
13 |
TKS 113318 |
Occupational Health & Safety |
3 |
- |
|
14 |
TKS 114318 |
Operational Research |
3 |
- |
MATA KULIAH PILIHAN SEMESTER GENAP |
|||||
No |
Kode MK |
Mata Kuliah |
In English |
SKS |
Prasyarat |
1 |
TKS 201418 |
Advance Concrete Structure |
3 |
- |
|
2 |
TKS 202418 |
Advance Steel Structure |
3 |
- |
|
3 |
TKS 203418 |
Advance Soil Mechanics |
3 |
- |
|
4 |
TKS 204418 |
Dynamics Foundation Design |
3 |
- |
|
5 |
TKS 205418 |
Hydraulic Structures |
3 |
- |
|
6 |
TKS 206418 |
Water Resources Management |
3 |
- |
|
7 |
TKS 207418 |
Project Planning & Controlling |
3 |
- |
|
8 |
TKS 208418 |
Road Constructions & Maintenance Management |
3 |
- |
|
9 |
TKS 209418 |
Railway Engineering |
3 |
- |
|
10 |
TKS 210418 |
Environmental Sanitation Infrastructure |
3 |
- |